MIL-DTL-6060E
TABLE I. Performance requirements.
TEST
PROPERTY
REQUIREMENT
PARAGRAPH
REFERENCE
Seam strength
No separation.
4.4.1
Double-seam leakage
No evidence of leakage at
4.4.2
double-seam joint.
Inspection window mounting
No evidence of leakage through
4.4.3
integrity
or around the perimeter of the
window.
Gasket mounting integrity
No evidence of separation or
4.4.4
degradation of gasket; no
leakage around gasket/bolt area.
4. VERIFICATION
4.1 Classification of inspections. The inspection requirements specified herein are classified
as follows:
a. First article inspection (see 4.2).
b. Conformance inspection (see 4.3).
4.2 First article inspection. First article inspection shall consist of all the tests and
examinations specified in this specification.
4.3 Conformance inspection. Conformance inspection shall consist of the performance tests
specified in 4.4.1, 4.4.2, 4.4.3, 4.4.4, and the visual examinations specified in 4.3.2.
4.3.1 Sampling for conformance inspection. For the purpose of determining the sample size
in accordance with ASQ-Z1.4, the lot size (see 6.3) shall be expressed in number of bags
produced in one production run. An inspection level as specified in ASQ-Z1.4 of S-1 shall be
used for the testing specified in 4.4 and level S-3 for the visual examinations specified in 4.3.2.
4.3.2 Examination of end item for defects in material, construction, dimensions and
tolerance, seams, and identification. The sample unit for the end item visual inspection shall be
one bag. The sample unit shall be visually inspected and measured to ensure it meets the
requirements specified in 3.2 through 3.10.
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business